A loved but sliding-down-the-hill rescue of a coastal icon. Various design iterations were tested before deciding on the obvious move of making it more beachcomber. To that end the upper form was stretched out & the lower level was opened up, with an accretion of failing decks demolished to make way for more gard. Steel beams had deflected, ground conditions were poor, all ably managed by Carl Tinson.
Built by Flagstone Constructions.


